Pros and cons of fixed price contracts

Fixed price contracts are a common type of agreement used in various industries, including construction, software development, and consulting. In a fixed price contract, the buyer and the seller agree on a set price for the project or service, regardless of any changes or unforeseen circumstances that may arise during the course of the work. While fixed price contracts offer certain advantages, they also come with their fair share of disadvantages. In this article, we will explore the .

Pros:

1. Budget Certainty: One of the main advantages of fixed price contracts is that they provide budget certainty for both parties involved. The buyer knows exactly how much they will have to pay for the project, and the seller knows how much they will receive. This allows for better financial planning and reduces the risk of cost overruns.

2. Reduced Administrative Burden: Fixed price contracts often require less administrative work compared to other types of contracts, such as time and materials contracts. Since the price is fixed, there is no need to track and document every hour or expense incurred during the project. This can save both parties time and resources.

3. Incentive for Efficiency: Fixed price contracts create an incentive for the seller to complete the project efficiently and within the agreed-upon budget. Since they are not compensated based on the number of hours worked or expenses incurred, the seller has a vested interest in delivering the project on time and within the allocated resources.

4. Risk Allocation: In a fixed price contract, the risk of cost overruns or delays is typically borne by the seller. This can provide peace of mind for the buyer, as they are protected from unexpected expenses or project delays. The seller, on the other hand, assumes the risk of underestimating the costs or encountering unforeseen challenges.

Cons:

1. Limited Flexibility: One of the main drawbacks of fixed price contracts is the limited flexibility they offer. Once the price is agreed upon, any changes or modifications to the scope of work can be difficult to accommodate without renegotiating the contract. This can lead to delays and additional costs.

2. Increased Risk for the Seller: While fixed price contracts can provide budget certainty for the buyer, they can also increase the risk for the seller. If the seller underestimates the costs or encounters unforeseen challenges, they may end up losing money on the project. This can discourage sellers from taking on complex or uncertain projects.

3. Lack of Collaboration: Fixed price contracts often promote a transactional relationship between the buyer and the seller, rather than a collaborative one. Since the price is fixed, there may be less incentive for the parties to work together to find innovative solutions or overcome obstacles. This can hinder creativity and problem-solving.

4. Difficulty in Managing Changes: As mentioned earlier, fixed price contracts can be challenging to manage when changes to the scope of work are required. Any modifications or additions to the project may require a formal change order, which can be time-consuming and costly. This can lead to delays and frustrations for both parties.

In conclusion, fixed price contracts offer budget certainty, reduced administrative burden, and incentives for efficiency. However, they also come with limited flexibility, increased risk for the seller, a lack of collaboration, and difficulties in managing changes. When considering a fixed price contract, it is essential to weigh these pros and cons carefully and assess the specific needs and risks of the project.

Keywords: fixed price contracts, pros, cons, budget certainty, reduced administrative burden, incentive for efficiency, risk allocation, limited flexibility, increased risk, lack of collaboration, difficulty in managing changes.

Long-tail phrases: advantages and disadvantages of fixed price contracts, benefits and drawbacks of fixed price contracts, pros and cons of fixed price agreements, reasons to choose fixed price contracts, challenges of fixed price contracts.


 

How to negotiate pricing terms for fixed price and time and materials contracts

Negocjowanie warunków cenowych jest nieodłączną częścią procesu zawierania umów, zarówno dla umów o stałej cenie, jak i umów na czas i materiały. W obu przypadkach istnieją różne czynniki, które należy wziąć pod uwagę i uwzględnić podczas negocjacji. W tym artykule omówimy kilka kluczowych kwestii, które warto rozważyć podczas negocjacji warunków cenowych dla obu rodzajów umów.

Umowy o stałej cenie są powszechnie stosowane w przypadku projektów, w których zakres prac jest dobrze określony i przewidywalny. W takich umowach ustala się stałą cenę za wykonanie określonego zakresu prac. Przy negocjowaniu warunków cenowych dla umów o stałej cenie, istotne jest uwzględnienie następujących czynników:

1. Dokładne określenie zakresu prac: Przed rozpoczęciem negocjacji należy dokładnie określić zakres prac, który ma być objęty umową. Im bardziej szczegółowe i jasne będą te informacje, tym łatwiej będzie oszacować koszty i negocjować cenę.

2. Analiza ryzyka: Przed podjęciem decyzji o ustaleniu ceny, należy dokładnie przeanalizować ryzyko związane z projektem. Jeśli istnieje duże ryzyko wystąpienia nieprzewidzianych okoliczności, warto uwzględnić to podczas negocjacji i ustalić odpowiednie zabezpieczenia finansowe.

3. Wycena kosztów: Przed negocjacjami warto przeprowadzić wycenę kosztów, aby mieć jasny obraz kosztów związanych z projektem. Warto uwzględnić zarówno koszty bezpośrednie (np. materiały, wynagrodzenia pracowników), jak i koszty pośrednie (np. koszty administracyjne, koszty utrzymania sprzętu).

4. Ustalenie harmonogramu płatności: Ważne jest ustalenie harmonogramu płatności, który będzie korzystny zarówno dla wykonawcy, jak i dla klienta. Można rozważyć różne opcje, takie jak płatność zaliczkowa, płatność na podstawie osiągniętych etapów projektu lub płatność po zakończeniu całego projektu.

Umowy na czas i materiały są bardziej elastycznym modelem umowy, w którym klient płaci wykonawcy za czas i materiały zużyte podczas realizacji projektu. Przy negocjowaniu warunków cenowych dla takich umów, należy wziąć pod uwagę następujące czynniki:

1. Stawki godzinowe: Warto ustalić stawki godzinowe dla różnych rodzajów pracowników, które będą uwzględniały zarówno koszty pracy, jak i zysk wykonawcy. Stawki te mogą być negocjowane na podstawie doświadczenia, kwalifikacji i specjalizacji pracowników.

2. Koszty materiałów: Należy dokładnie określić, jakie materiały będą potrzebne do realizacji projektu i jakie będą ich koszty. Warto również ustalić, kto będzie odpowiedzialny za zakup materiałów i czy wykonawca otrzyma dodatkowe wynagrodzenie za zarządzanie tym procesem.

3. Monitorowanie czasu i materiałów: Ważne jest ustalenie, w jaki sposób będzie monitorowany czas i zużycie materiałów. Można rozważyć różne metody, takie jak prowadzenie dzienników pracy, raportowanie zużycia materiałów lub korzystanie z systemów monitorowania czasu.

4. Limit kosztów: Warto rozważyć ustalenie limitu kosztów, który nie może być przekroczony bez zgody klienta. Jest to ważne zabezpieczenie, które chroni klienta przed niekontrolowanym wzrostem kosztów.

Podsumowując, negocjowanie warunków cenowych dla umów o stałej cenie i umów na czas i materiały wymaga uwzględnienia wielu czynników. Kluczowe jest dokładne określenie zakresu prac, analiza ryzyka, wycena kosztów oraz ustalenie harmonogramu płatności lub stawek godzinowych i kosztów materiałów. Pamiętaj, że negocjacje powinny być prowadzone w sposób partnerski, aby osiągnąć korzystne warunki dla obu stron.

Słowa kluczowe: negocjacje, warunki cenowe, umowa o stałej cenie, umowa na czas i materiały, zakres prac, ryzyko, wycena kosztów, harmonogram płatności, stawki godzinowe, koszty materiałów, monitorowanie czasu i materiałów, limit kosztów.

Frazy kluczowe: jak negocjować warunki cenowe dla umów o stałej cenie, jak negocjować warunki cenowe dla umów na czas i materiały, negocjowanie warunków cenowych, umowa o stałej cenie, umowa na czas i materiały, zakres prac, analiza ryzyka, wycena kosztów, harmonogram płatności, stawki godzinowe, koszty materiałów, monitorowanie czasu i materiałów, limit kosztów.


 

How to handle unforeseen circumstances in fixed price and time and materials contracts

Two common types of contracts used in the business world are fixed price contracts and time and materials contracts. Each has its own advantages and disadvantages, and each requires a different approach when it comes to handling unforeseen circumstances.

Fixed price contracts, as the name suggests, involve a predetermined price for the completion of a project. This type of contract is often used when the scope of work is well-defined and the risks associated with the project are relatively low. However, when unforeseen circumstances arise, such as changes in market conditions, regulatory requirements, or unexpected technical challenges, the fixed price nature of the contract can become a source of tension between the parties.

To handle unforeseen circumstances in fixed price contracts, it is important to have a clear and comprehensive change management process in place. This process should outline the steps to be taken when a change request is made, including assessing the impact of the change on the project timeline and budget, negotiating any necessary adjustments to the contract, and obtaining the necessary approvals from all parties involved. Effective communication and collaboration between the contracting parties are crucial during this process to ensure that any changes are properly documented and agreed upon.

In contrast, time and materials contracts provide more flexibility when it comes to handling unforeseen circumstances. These contracts typically involve paying for the actual time spent and materials used on a project, rather than a fixed price. This type of contract is often used when the scope of work is uncertain or subject to change, and the risks associated with the project are higher.

When unforeseen circumstances arise in a time and materials contract, the focus shifts to managing the impact on the project timeline and budget. It is important to have a mechanism in place for tracking and documenting any additional time and materials required due to the unforeseen circumstances. This can involve regular reporting and review meetings, as well as ongoing communication between the contracting parties to ensure that any changes are properly accounted for and approved.

Regardless of the type of contract used, it is important to approach unforeseen circumstances with a proactive mindset. This means being prepared for the unexpected and having contingency plans in place to mitigate the impact of any unforeseen events. It also means maintaining open lines of communication and fostering a collaborative relationship between the contracting parties, so that any issues can be addressed and resolved in a timely manner.

In conclusion, handling unforeseen circumstances in fixed price and time and materials contracts requires careful planning, effective communication, and a proactive approach. By having clear change management processes in place and maintaining open lines of communication, the contracting parties can navigate through unexpected challenges and ensure the successful completion of the project.

Keywords: unforeseen circumstances, fixed price contracts, time and materials contracts, change management process, project timeline, project budget, communication, collaboration, proactive mindset, contingency plans, change request, impact assessment, negotiation, approvals, tracking, documentation.

Long-tail phrases:
– How to handle unforeseen circumstances in fixed price contracts
– Change management process in fixed price contracts
– Impact assessment in fixed price contracts
– Negotiating adjustments in fixed price contracts
– Approvals in fixed price contracts
– Tracking additional time and materials in time and materials contracts
– Documentation in time and materials contracts
– Managing project timeline in time and materials contracts
– Managing project budget in time and materials contracts
– Proactive approach to unforeseen circumstances in contracts.


 

The impact of client requirements on the choice of pricing model

Understanding client requirements:
Before delving into , it is essential to understand what these requirements entail. Client requirements refer to the specific needs, expectations, and preferences of the clients regarding the product or service they are seeking. These requirements can vary significantly depending on factors such as industry, target market, budget, and desired outcomes. Some clients may prioritize cost-effectiveness, while others may value quality or customization. It is crucial for businesses to identify and analyze these requirements to tailor their pricing models accordingly.

Impact on pricing model selection:
Client requirements have a direct impact on the choice of pricing model. Companies need to consider various factors such as the level of customization, value-added services, and the overall value proposition they offer to clients. For instance, if clients demand highly customized solutions, a pricing model based on a fixed fee or retainer may be more suitable. On the other hand, if clients prioritize cost-effectiveness, a usage-based or subscription-based pricing model may be more appropriate. By aligning the pricing model with client requirements, companies can enhance customer satisfaction, build long-term relationships, and gain a competitive edge in the market.

Key considerations:
When selecting a pricing model based on client requirements, businesses need to consider several key factors. Firstly, they must assess the cost structure and profitability implications of each pricing model. Some pricing models may require higher upfront investments or ongoing maintenance costs, which need to be factored into the decision-making process. Secondly, companies should evaluate the scalability and flexibility of the pricing model. As client requirements evolve over time, the pricing model should be adaptable to accommodate these changes. Additionally, businesses need to consider the competitive landscape and industry norms to ensure their pricing model remains competitive and attractive to clients.

Long-tail phrases:
1. Importance of aligning pricing strategies with client needs
2. Tailoring pricing models to meet client requirements
3. Customization as a key factor in pricing model selection
4. Cost-effectiveness versus quality: balancing client preferences
5. The role of value-added services in pricing model choice
6. Enhancing customer satisfaction through pricing model alignment
7. Building long-term client relationships through pricing strategies
8. Gaining a competitive edge by aligning pricing with client needs
9. Assessing cost structure and profitability implications of pricing models
10. Scalability and flexibility considerations in pricing model selection
11. Adapting pricing models to evolving client requirements
12. Competitiveness and attractiveness of pricing models in the market

In conclusion, cannot be underestimated. Businesses must carefully analyze and understand the specific needs and preferences of their clients to align their pricing strategies accordingly. By tailoring pricing models to meet client requirements, companies can enhance customer satisfaction, build long-term relationships, and gain a competitive edge in the market. It is crucial for businesses to consider factors such as customization, cost-effectiveness, value-added services, and industry norms when selecting a pricing model. Ultimately, the successful alignment of pricing strategies with client needs can significantly contribute to the overall success and profitability of a business.


 

Strategies for managing project risks in fixed price and time and materials contracts

Fixed Price Contracts:
Fixed price contracts are commonly used when the scope and requirements of the project are well-defined and stable. Under this contract type, the project is executed based on a predetermined price, and any changes or additional work may result in additional costs. Here are some strategies for managing project risks in fixed price contracts:

1. Thoroughly define the scope: One of the key strategies for managing risks in fixed price contracts is to have a well-defined scope. This includes clearly outlining the project objectives, deliverables, and any specific requirements. By having a clear scope, the project team can better identify and manage potential risks.

2. Conduct a comprehensive risk assessment: Before starting the project, it is essential to conduct a thorough risk assessment. This involves identifying potential risks, assessing their impact on the project, and developing mitigation strategies. By proactively addressing risks, the project team can minimize their impact on the project’s cost and schedule.

3. Establish a change control process: In fixed price contracts, any changes to the scope or requirements may result in additional costs. To manage this risk, it is crucial to establish a change control process. This process should include a formal mechanism for evaluating and approving changes, as well as a clear communication plan to ensure all stakeholders are aware of any changes and their associated costs.

4. Monitor project progress: Regular monitoring of project progress is essential in fixed price contracts. This includes tracking key performance indicators, such as cost and schedule variances, to identify any potential risks or deviations from the plan. By closely monitoring project progress, the project team can take timely corrective actions to mitigate risks and ensure project success.

Time and Materials Contracts:
Time and materials contracts are commonly used when the scope and requirements of the project are uncertain or likely to change. Under this contract type, the project is executed based on the actual time and materials used, and the client pays for the actual costs incurred. Here are some strategies for managing project risks in time and materials contracts:

1. Embrace flexibility: One of the key advantages of time and materials contracts is the flexibility they offer. To effectively manage risks in such contracts, it is important to embrace this flexibility and be prepared for changes in scope or requirements. This includes having a flexible project plan and a responsive project team that can adapt to changing circumstances.

2. Continuously communicate with the client: In time and materials contracts, regular communication with the client is crucial. This includes providing frequent updates on project progress, discussing any potential risks or changes, and seeking client input and feedback. By maintaining open and transparent communication, the project team can effectively manage risks and ensure client satisfaction.

3. Implement agile project management practices: Agile project management practices, such as iterative development and frequent feedback loops, can be highly effective in managing risks in time and materials contracts. These practices allow for early identification and mitigation of risks, as well as the ability to adapt to changing requirements. By embracing agile practices, the project team can enhance project flexibility and responsiveness.

4. Monitor project costs: In time and materials contracts, it is important to closely monitor project costs to manage risks effectively. This includes tracking the actual time and materials used, comparing them to the budgeted amounts, and identifying any potential cost overruns. By closely monitoring project costs, the project team can take timely actions to control expenses and mitigate risks.

Conclusion:
Managing project risks is a critical aspect of project management, regardless of the contract type. In fixed price contracts, strategies such as defining the scope, conducting a comprehensive risk assessment, establishing a change control process, and monitoring project progress can help mitigate risks. In time and materials contracts, embracing flexibility, continuous communication with the client, implementing agile project management practices, and monitoring project costs are key strategies for managing risks. By employing these strategies, project managers can effectively manage risks and ensure project success.

Keywords: project risks, fixed price contracts, time and materials contracts, risk assessment, change control process, project progress, flexibility, communication, agile project management, project costs.

Long-tail phrases: strategies for managing project risks in fixed price contracts, strategies for managing project risks in time and materials contracts, risk assessment in fixed price contracts, change control process in fixed price contracts, project progress monitoring in fixed price contracts, flexibility in time and materials contracts, communication in time and materials contracts, agile project management in time and materials contracts, project cost monitoring in time and materials contracts.


 

How to ensure customer satisfaction in fixed price and time and materials contracts

First and foremost, clear communication is essential. From the very beginning of the contract negotiation process, it is important to establish open and transparent communication channels with the customer. This includes discussing their expectations, requirements, and any potential challenges that may arise during the project. By setting clear expectations and maintaining regular communication throughout the project, businesses can avoid misunderstandings and ensure that the customer’s needs are met.

Another important aspect of ensuring customer satisfaction in fixed price and time and materials contracts is delivering high-quality work. Regardless of the pricing structure, customers expect the final product or service to meet their standards and requirements. This means that businesses need to invest in skilled and experienced professionals who can deliver top-notch work. Additionally, businesses should have quality control measures in place to ensure that the work meets the agreed-upon standards.

Flexibility is also key in these types of contracts. While the price and time may be fixed, unexpected changes or challenges can arise during the project. It is important for businesses to be flexible and adaptable in order to address these issues effectively. This may involve revisiting the initial agreement and making necessary adjustments to accommodate the changes. By being flexible, businesses can demonstrate their commitment to customer satisfaction and their willingness to go the extra mile to meet the customer’s needs.

Timeliness is another crucial factor in ensuring customer satisfaction. In fixed price contracts, customers expect the project to be completed within the agreed-upon timeframe. Similarly, in time and materials contracts, customers expect the work to be done efficiently and without unnecessary delays. Businesses need to prioritize timeliness and ensure that they have the necessary resources and manpower to meet the project deadlines. Regular progress updates and timely communication with the customer can also help manage expectations and avoid any potential dissatisfaction.

Lastly, businesses should focus on providing excellent customer service throughout the duration of the project. This includes being responsive to customer inquiries and concerns, addressing any issues promptly, and providing regular updates on the project’s progress. By providing exceptional customer service, businesses can build trust and loyalty with their customers, leading to higher levels of satisfaction.

In conclusion, ensuring customer satisfaction in fixed price and time and materials contracts requires clear communication, delivering high-quality work, flexibility, timeliness, and excellent customer service. By focusing on these key areas, businesses can meet customer expectations and build strong, long-lasting relationships. Ultimately, customer satisfaction is the foundation for success in any business.

Keywords: customer satisfaction, fixed price contracts, time and materials contracts, communication, expectations, high-quality work, flexibility, timeliness, customer service.

Long-tail phrases: ensuring customer satisfaction in fixed price and time and materials contracts, clear communication in fixed price and time and materials contracts, delivering high-quality work in fixed price and time and materials contracts, flexibility in fixed price and time and materials contracts, timeliness in fixed price and time and materials contracts, customer service in fixed price and time and materials contracts.


 

Advantages and disadvantages of time and materials contracts

Advantages:

1. Flexibility: One of the main advantages of time and materials contracts is the flexibility they offer. Unlike fixed-price contracts, where the scope of work and price are predetermined, time and materials contracts allow for changes and adjustments throughout the project. This flexibility is particularly beneficial in situations where the project requirements are uncertain or subject to change.

2. Transparency: Time and materials contracts provide a high level of transparency for both parties involved. The contractor is required to provide detailed records of the time spent on the project and the materials used, allowing the client to have a clear understanding of the costs incurred. This transparency helps build trust and minimizes the risk of disputes related to billing.

3. Cost Control: Time and materials contracts provide better cost control for the client. Since the contractor is paid based on the actual time spent and materials used, the client has more control over the project’s budget. This allows for better financial planning and reduces the risk of unexpected cost overruns.

4. Incentive for Efficiency: Time and materials contracts create an incentive for the contractor to work efficiently. Since they are paid based on the time spent, contractors have a motivation to complete the project as quickly as possible without compromising quality. This can lead to faster project completion times and increased productivity.

Disadvantages:

1. Uncertain Costs: One of the main disadvantages of time and materials contracts is the uncertainty of costs. Since the final price is determined by the time spent and materials used, it can be challenging to estimate the total cost accurately. This uncertainty can make it difficult for clients to budget and plan for the project.

2. Lack of Accountability: Time and materials contracts may lack accountability compared to fixed-price contracts. Since the contractor is not bound by a predetermined scope of work, there is a risk of scope creep, where additional work is added without proper documentation or approval. This can lead to disputes and increased costs for the client.

3. Potential for Overbilling: In some cases, time and materials contracts can lead to overbilling. Without proper monitoring and control, contractors may inflate the time spent or overstate the materials used to increase their payment. This can result in unnecessary costs for the client and damage the trust between the parties involved.

4. Administrative Burden: Time and materials contracts require more administrative work compared to fixed-price contracts. The client needs to closely monitor and verify the contractor’s records to ensure accuracy and prevent potential issues. This additional administrative burden can be time-consuming and may require additional resources.

In conclusion, time and materials contracts offer flexibility, transparency, cost control, and incentives for efficiency. However, they also come with disadvantages such as uncertain costs, lack of accountability, potential for overbilling, and increased administrative burden. It is crucial for both parties to carefully consider these advantages and disadvantages before entering into a time and materials contract to ensure a successful and mutually beneficial project.

Keywords: time and materials contracts, advantages, disadvantages, flexibility, transparency, cost control, incentive for efficiency, uncertain costs, lack of accountability, potential for overbilling, administrative burden.

Long-tail phrases: time and materials contracts in construction industry, flexibility in time and materials contracts, transparency in time and materials contracts, cost control in time and materials contracts, incentive for efficiency in time and materials contracts, uncertain costs in time and materials contracts, lack of accountability in time and materials contracts, potential for overbilling in time and materials contracts, administrative burden in time and materials contracts.


 

The role of risk management in choosing between fixed price and time and materials

Risk management plays a crucial role in this decision-making process. It involves identifying, assessing, and mitigating potential risks that could impact the project’s success. By considering the risks involved, project managers can make informed decisions about the pricing model that best suits their project’s needs.

Fixed price contracts are commonly used when the project requirements are well-defined and stable. In this approach, the project is priced based on a predetermined scope of work, and any changes or additional requirements are typically handled through change orders. The advantage of a fixed price contract is that it provides certainty in terms of cost and timeline. However, it also carries the risk of underestimating the effort required or encountering unforeseen challenges, which can lead to cost overruns and delays.

On the other hand, time and materials contracts are more flexible and suitable for projects with evolving requirements or a high level of uncertainty. In this approach, the project is billed based on the actual time spent and materials used. This allows for greater adaptability and responsiveness to changes. However, it also introduces the risk of scope creep, where the project expands beyond its original boundaries, leading to increased costs and potential delays.

Risk management comes into play when evaluating the potential risks associated with each pricing model. For fixed price contracts, the project manager needs to carefully assess the project’s requirements and potential risks to ensure that the scope is well-defined and any uncertainties are adequately addressed. This may involve conducting thorough risk assessments, engaging subject matter experts, and establishing contingency plans to mitigate potential risks.

In the case of time and materials contracts, risk management focuses on identifying and managing the risks associated with evolving requirements and scope creep. Project managers need to establish clear communication channels with the client to ensure that any changes are properly documented and agreed upon. They also need to closely monitor the project’s progress and budget to identify any potential risks early on and take appropriate actions to mitigate them.

Ultimately, the choice between fixed price and time and materials depends on the project’s specific requirements, level of uncertainty, and the organization’s risk appetite. Risk management plays a critical role in this decision-making process by helping project managers assess and mitigate potential risks associated with each pricing model.

In conclusion, risk management is an essential aspect of choosing between fixed price and time and materials contracts. It enables project managers to evaluate the potential risks and uncertainties associated with each pricing model and make informed decisions. By considering the project’s specific requirements and level of uncertainty, project managers can select the pricing model that best aligns with their organization’s risk appetite and maximizes the chances of project success.

Keywords: risk management, fixed price, time and materials, project management, uncertainty, scope creep, cost overruns, delays, pricing model, project requirements, risk assessment, contingency plans, communication channels, budget monitoring, risk appetite.

Long-tail phrases:
– The importance of risk management in project pricing decisions
– Evaluating risks in fixed price and time and materials contracts
– Mitigating risks in fixed price and time and materials projects
– Factors influencing the choice between fixed price and time and materials
– Balancing certainty and flexibility in project pricing

Specjalista Google Ads i Analytics w CodeEngineers.com
Nazywam się Piotr Kulik i jestem specjalistą SEO, Google Ads i Analytics. Posiadam certyfikaty Google z zakresu reklamy i analityki oraz doświadczenie w pozycjonowaniu stron oraz sklepów internetowych.

Jeśli interesują Cię tanie sponsorowane publikacje SEO bez pośredników - skontaktuj się z nami:

Tel. 511 005 551
Email: biuro@codeengineers.com
Piotr Kulik
Ostatnio opublikowane przez Piotr Kulik (zobacz wszystkie)